Safety Notice for Flexitron HDR Afterloader, Nucletron
2011.08.02
Product group Radiotherapy / Radiation protection
Reference 02414/11
Nucletron BV has issued a notice concerning a failure of the door interlock during the Source Alignment Procedure. The software in the upcoming TCC 2.1 release will be adapted in such a way that the Door Interlock must be closed before the source alignment procedure can be started.
Safety Notice for Flexitron HDR Afterloader, Nucletron , Download_VeroeffentlichtAm_EN